Telegram update
Ahmad · Site supervisor · 4:38 PM
PROJECT CONTROL FOR ENGINEERING CONTRACTORS
Rangka turns Telegram messages, voice notes and site photos into a structured daily-report draft—ready for the project manager to review and approve.
AI prepares. The PM approves.
Field update received
Read-only product demonstrationAhmad · Site supervisor · 4:38 PM
19 Aug 2026 · PR-12
✓Grouped automatically
Awaiting PM confirmation
92% task match
1 decision waiting
ISSUEAnchor-bolt alignment
AI-prepared → PM-controlled
Approved by N. Rahman · 4:52 PM
Update approved
Original message, voice note, and photos remain attached
THE DAILY CONTROL QUESTIONS
Messages, voice notes, and photographs are grouped under the project and date so the day can be reviewed as one evidence trail.
12 updates · 4 photos · 1 voice noteAhmad · Telegram6 of 8 pipe supports installed at Grid B2.
Rangka prepares the work completed, progress, issue, and likely schedule activity. The PM confirms or corrects the interpretation.
Pipe support installation · 92% matchApproved facts flow into the task and daily-report draft. Any schedule movement remains a separate, explicit PM decision.
Report draft updated · evidence attachedDaily reportDraft updated
Activity progress75%
Evidence4 items attached
HOW RANGKA WORKS
The supervisor sends an ordinary Telegram message, photograph, or voice note.
Rangka groups the source evidence under the correct project and work date.
The PM checks the interpretation, task match, progress, report wording, and any schedule effect.
Only the PM decides what updates the task, report draft, approved schedule, or project record.
ONE PROJECT STATE
Telegram remains the field interface. Rangka preserves the original text, voice, and photographs, then makes the day searchable by project and date.
Less chasing. A clearer source record.See the Telegram workflowMaterial delivery arrived at laydown.Telegram · Delivery
Pipe supports installed at Grid B2.Telegram · 2 photographs
6 of 8 supports complete. Voice attached.Telegram · Progress
Maintain dated activities, milestones, dependencies, working days, baseline dates, and progress in a practical Gantt. Test a delay without changing the saved schedule, then approve or reject the proposal.
Nothing moves silently.Use the free Gantt makerMaterial delivery100%
Pipe support installation75%
Pipe spool erection30%
Final inspection0%
Reviewed field updates prepare the daily-report draft. The PM can edit the wording, include or exclude contributions, attach missing photographs, and approve the final report.
The source evidence stays connected.Open the free report templateSix of eight pipe supports installed at Grid B2. Alignment verification continued.
One anchor-bolt position required correction before the remaining supports could proceed.
12 messages 4 photographs 2 contributors
HUMAN APPROVAL IS THE SYSTEM
Rangka can interpret a field update and calculate a proposed schedule effect. It cannot decide that an uncertain statement is contractual fact. The project manager sees the source, changes the prepared fields where necessary, and chooses the outcome.
“6 of 8 supports installed. One anchor-bolt issue.”
Telegram message · voice · 2 photosEdited: hold affects two remaining supports only.
✓ Approved to project recordBUILT AROUND THE PROJECT TEAM
Send the update in Telegram. No second site app, duplicate form, or special reporting interface.
Review one structured proposal against the source evidence before it affects progress or the report.
See reporting activity and approval state across active projects without counting every field contributor as a paid seat.
OLD WORKFLOW / RANGKA WORKFLOW
PRICING THAT FOLLOWS THE WORK
Start with one active project for free. Paid plans add capacity by active-project slot; completed projects remain readable and stop using a slot.
Compare all plans$0/ forever
$39/ active project / month · no tax
$59/ active project / month · no tax
COMMON QUESTIONS
No. The field workflow uses Telegram. Project managers use the Rangka web workspace for review, scheduling, reports, and records.
No. Daily reports remain drafts until an authorised project manager approves them.
No. A detected delay can produce a proposed impact, but nothing changes until the PM explicitly confirms the effect and approves the update.
The source message, voice note, transcript, and photographs remain connected to the field update and approved task history. Messages are hidden, not deleted.
Not currently. Telegram is the supported field-ingestion channel.
The Free plan does not expire and includes one active project, three workspace users, field contributors, and limited monthly AI and PDF usage. No credit card is required.
No. Core and Business are priced per active-project slot. Field contributors do not consume workspace seats.
START WITH ONE LIVE PROJECT